At subsite level in the project, go to subsite setup and enable Cycle Mode.<br>
Then if you highlight the subsite when clicking the Run button, all enabled tests under that level will be executed once per cycle.  The data will appear at each test but rather than Append2, Append3, etc.  They will be cycle1, cycle2, etc.<br>
<br>
How to also have some pause for 10 minutes for each cycle?<br>
Do you have the compiler a the KULT tool is functional on your 4200?<br>
If yes, you could make a simple routine that waits for the desired duration before returning control back to KITE for the cycles to continue.<br>
<br>
NOTE:  on the new 4200A-SCS, the compiler is always there.  Older 4200-SCS, depending on vintage, needed it installed as an option.  Open the KULT tool from desktop icon and see if it complains or not.